Denounce with righteous indignation and dislike men who are beguiled and demoralized by the charms pleasure moment so blinded desire that they cannot foresee the pain and trouble.
Read More- All
- Surface Water
- Ground Water
- Remote Sensing

Study Related to Brahmaputra River bank protection for Guwahati Riverfront Development
TATA Consulting Engineers Ltd.

Satellite imagery based on one-dimensional morphological changes in River Sone.
VKS Infratech Management Pvt. Ltd.

High Level Bridge over River Teesta with approaches near Haldibari, connecting Mekhliganj with Mekhliganj/ Haldibari in the district of Coochbehar, West Bengal - Work Order for Assessment of Scour Level.
S. P. Singla Constructions Pvt. Ltd

Carrying out computational modelling of Tech Revetment™ system
Terre Armee

Model Study for water Intake structure on Ganga River at Sahibganj for 2x800 MW Godda Thermal Power Project, Village: Motia, District: Godda, Jharkhand
Adani Power (Jharkhand) Limited

Design and Drawings of Environment Friendly Foundation & Scour Protection Works at Abutments and Pier of Major Bridge at Km. 50+000 Over Satluj River for Shahkot - Moga Section of NH-71 (New NH-521) in the State of Punjab
Dilip Buildcon Limited

Consultancy Services for Study, Preparation and Submission of Disaster Mitigation Plan' for 2 x 800 MW Ultra Supercritical Coal Based Thermal Power Project, Village Motia, Dist. Godda, State: Jharkhand.
Adani Power (Jharkhand) Limited

Four laning of Bhojpur to Buxar from Km.27.370 to Km 75.00 of NH-84 (Design Chainage Km 77.100 to Km.125.00) in the State of Bihar under NHDP Phase-III on EPC mode - Work Order for Design Discharge Calculations.
S. P. Singla Constructions Pvt. Ltd

Analysis of Satellite imageries, review of hydraulic software modelling for flood plain zoning work along the River Bhagirathi, Mandakini, Alaknanda, Bhilangana and Ganga in Uttarakhand
PKS Infra Engineers Pvt. Ltd.

Pump Performance Curves (Dredging Application) for Pump OSL-DE-009
Ocean Sparkle Limited

C/o 4-laning of NH-37A from Km. 0.00 (Kaliabor Tiniali road junction) to Km.17.300 (Dolabari road junction) including c/o new Brahmaputra bridge on EPC basis in the state of Assam - Work Order for Assessment of Bank Protection Measures
S. P. singla Constructions Pvt. Ltd

Construction of Mechi Bridge and approaches on India-Nepal border linking Kakarvitta in Nepal and Panitanki in India under Engineering, Procurement and Construction (EPC) Mode - Work Order for Mathematical Modelling for Mechi Bridge.
Dineshchandra R. Agrawal Infracon Pvt. Ltd

Consultancy services for obtaining approval form IIT for 4 nos. of bridges/culvert along Godda railway corridor. for 2 X 800MW Ultra Supercritical Coal Based Thermal Power Project Village Motia, Dist. Godda, Jharkhand
Adani Infra (India) Limited

Obtaining GAD and Specification approval from IIT of proposed pipelines under NTPC's existing railway.
Adani Infra (India) Limited

Design Development excluding Extradosed Bridge substructure and superstructure for Construction of new 4-lane Bridge (Parallel to the Existing MG Setu) with its approaches from km 0/000 to km 14/500 across river Ganga on NH-19 at Patna in the State of Bihar on EPC Mode - Sub Consultancy Services for Design Discharge and HFL at Gandhighat, Patna
B&S Engineering Consultants Pvt. Ltd.

Construction of New 2- lane Major Bridge including approaches over Brahmaputra Between Majuli on North Bank and Jorhat on South Bank from Km 11/690 to Km 19/715 - Length of Bridge 6812.5 m (Package II) on NH 715 K in the State of Assam on EPC mode - Work Order for Hydraulic assessments for Major Bridge over river Brahmaputra between Majuli on North Bank and Jorhat on South Bank
S. P. Singla Constructions Pvt. Ltd

Sustainable Groundwater management and artificial groundwater recharge for a mine in Nigeria
African Natural Resources and Mines Ltd.

Providing consultancy services for conducting 3 nos of Plate Load Test to ascertain SBC value and submission of investigation report for Phaphamau STP, Naini-II STP and Jhunsi STP NMCG at Prayagraj, Uttar Pradesh, India
Adani Infra (India) Limited

Construction of New Six lane Bridge including its approaches across River Ganga on NH-96 (New NH-330) at Phaphamau, Prayagraj in Uttar Pradesh on EPC mode - Design discharge & scour level calculation
S. P. Singla Constructions Pvt. Ltd

Mathematical modelling, Morphological Assessment and Technical Advisory Services for Construction of Jia Bharali Bridge along with its approaches and River Training Work from km 25.552 to km 27.500 of NH- 37A (New NH-715) in the State of Assam
MKCIL-RSM(JV)

Preparation and submission of Impact Assessment Report of ground water abstraction with modelling as per requirement of CGWA required in respect of NOC renewal of Gondegaon OC Mine, Kamptee Deep OC Mine and INDER UG to OC Mine under Gondegaon and Kamptee Sub Area respectively of M/s.WCl, Nagpur Area.
Sujalam consultants

Construction of New 4-Lane Bridge (Parallel to the Existing MG Setu) with its approaches from Km 0/000 to Km 14/500 across River Ganga on NH-19 at Patna in the State of Bihar on EPC mode - Work Order for Mathematical Modelling
S. P. Singla Constructions Pvt. Ltd

Consultancy Services for Area flood drainage study for 500KTPA Kutch Copper limited Plant at Mundra Gujarat
Kutch Copper Limited

Construction of New Two-Lane Bridge with its approaches from Km 0+000 to Km. 4+385 across River Brahmaputra on NH-17 at Jogighopa in the State of Assam on EPC mode - Work Order for Hydrological and Hydraulic Assessments including Mathematical Modelling and Necessary Topography and Bathymetry Survey.
S. P. Singla Constructions Pvt. Ltd

Ground Water impact assessment report with modelling for IOCL Barauni Refinery
Sujalam Consultants

Preparation and submission of Impact Assessment Report of ground water abstraction with modelling as per requirement of CGWA required in respect of NOC renewal of Gondegaon OC Mine, Kamptee Deep OC Mine and INDER UG to OC Mine under Gondegaon and Kamptee Sub Area respectively of M/s.WCl, Nagpur Area.
Sujalam Consultants

Project Preparation of Preliminary Project Reports & Bid documents for Tilaiya Mega Lift Irrigation Scheme in Irrigation Division, Barhi
Sigma Resource Development Consultants PVT. LTD.

Preparation of Detailed Project Report (DPR) and Model Testing (with approval from IIT or any other institute of same repute) for Straightening of meander of Sadabah river passing through the Rajhara North (Central & Eastern) coal mines allocated to Fairmine Carbons Pvt. Ltd. and final Approval of DPR from Water Resource Department, Govt. of Jharkhand.
Sigma Resource Development Consultants PVT. LTD.

Field studies, preparation of Ground Water Impact Assessment Report, 3D Groundwater Flow Modeling Report, Comprehensive Hydrogeology report, submission of reports and related / supporting documents to Regional Director, Central Ground Water Authority {CGWA}, in accordance with the guideline, circulars, gazette notifications issued by CGWA, and obtaining NOC for ground water withdrawal from CGWA for Chandragupt Block, Hazaribagh, Jharkhand.
Sushee Infra & Mining Ltd

PO for flood monitoring solution in India
NEC Corporation India Pvt. Ltd.

(Extension of Preparation of Preliminary Project Reports & Bid documents for Tilaiya Mega Lift Irrigation Scheme in Irrigation Division, Barhi.) Preparation of Map on defined blocks (10 blocks).
Sigma Resource Development Consultants Pvt. Ltd.

Preparation of Detailed Project Report for Slope Protection Work, Sinking Zones and Bridges on Hill & Valley Side in between From Km 368.000 to Km 468.000 (NH-07) in the State of Uttarakhand.
VKS Infratech Management Pvt. Ltd.

Study of Contamination of underground water and associated health issues" for Udupi Power Corporation Limited, 2 x 600 MW Thermal Power Plant, Yelluru Village, Pilar Post, Padubidri, Udupi Dist., Karnataka.
Udupi Power Corporation Limited

Engagement of Geological Consultant for site investigation vis a vis water seepage from basement at the Courtyard property of Marriott – Bengaluru ORR
ESSARtech Consulting & Waterproofing Services Pvt. Ltd.

Area Drainage Study and storm water management proposal to prevent flood damages for VCPL Plant, Pantnagar.
V-Guard Consumer Products Limited

Preparation of detailed project report for design of river bank protection systems for Bridge at Posonalla River in Arunachal Pradesh.
Dhage-Patil Agro Products Pvt. Ltd.

Preparation of, Comprehensive & Feasible Rainwater Harvesting/Recharge Proposal for Chandragupt Project to meet the Central Ground Water Authority (CGWA), and TOR requirements Water conversation measures & plans
Sushee Chandragupt Coal Mine Private Limited

Consultancy Services for Identification & Preparation of Detailed Project Report for Slope Protection Work on Hill & Valley Side, Sinking Zone and Bridges in between Km 368.000 to Km 468.000 (NH-07) in the State of Uttarakhand - Work Order for Geotechnical Investigations
VKS Infratech Management Pvt. Ltd.

Preparation of Detailed project report for design of riverbank protection systems for approach road at Lohit River in Arunachal Pradesh.
Dibang Infra Projects Limited

Service Order for providing consultancy services for Area flood drainage study for 10+ GW Hybrid Power Project, Khavda Kutch Gujarat
Adani Green Energy Limited

Detailed Project Report for Rehabilitation of Major Storm Water Drainage System in Moradabad City and construction stage support
Design Evolution Pvt Ltd

Preparation of Detailed Project Report for Slope Protection Work on Hill & Valley Side, Sinking Zone and Bridges in between Km 368.000 to Km 468.000 (NH-07) in the State of Uttarakhand- Geological Survey
VKS Infratech Management Pvt. Ltd.

Construction of New 4-Lane Bridge (Parallel to the Existing MG Setu) with its approaches from Km 0/000 to Km 14/500 across River Ganga on NH-19 at Patna in the State of Bihar on EPC mode- Work Order for Morphological Study
S. P. Singla Constructions Pvt. Ltd

Construction of 4-Lane Greenfield Amritsar connectivity for connetion of Amritsar with Delhi-Amritsar-Katra Expressway from Juntion with Kapurthala -Sultanpur Lodhi road (NH-703) Near Isharwal village ch. 24+000 to MDR Juntion at Ch.40+900 Dhunda village on EPC mode under Bharatmala Pariyojna in the State of Punjab-Work Order for Mathematical Hydraulic Model Studied and Computation of Design Discharge & HFL
S. P. Singla Constructions Pvt. Ltd
C/o 4- Laning of NH-37 A from Km 0.00 (Kaliabor Tiniali road junction) to Km.17.300 ( Dolabari road junction) including C/o New Brahmaputra Bridge on EPC basis in the state of Assam under phase A of SARDP-NE- Work order For Study, Analysis and Modeling for Design of Bank Protection Works
S. P. Singla Constructions Pvt. Ltd